    • Cobb Mechanical’s qualified and experienced in-house engineers and support personnel can respond immediately to questions or problems.
    • Our trained technicians are on staff for initial balancing adjustment of systems to ensure customer satisfaction.
    • Our service and start-up professionals are involved throughout the project and remain at our clients’ disposal throughout the warranty period and beyond.
  • Utilizing BIM technologies to
    facilitate design, coordination,
    fabrication and installation.

  • Cobb Mechanical provides in-house
    quality control to ensure that our work
    meets the highest industry standards.

  • Commercial and
    Institutional Construction

    CONTACT US TODAY
  • Cobb Mechanical’s state-of-art
    fabrication shops are located
    in Colorado Springs.

University of Colorado Benson

The Benson Earth Sciences Building at the University of Colorado at Boulder opened in 1999.

The 87,000 square-foot building houses the Geological Sciences department and the Jerry Crail Johnson Earth Sciences and Map Library. It has five levels, including the basement. The building features a three-story stone atrium with a glass roof and contains an 11,000 square-foot library, departmental offices, a 175-seat centrally scheduled classroom, a large lecture hall, faculty offices and laboratories. The facility was built on time, within budget and meeting every expectation of the university.

Location: Boulder, CO
General Contractor: PCL Construction Services
Mechanical Contract Value: $2,062,518
Date Completed: 1999

University of Texas at Tyler

The University of Texas at Tyler’s Engineering, Science and Technology facility opened in 2006.

It consists of two buildings totaling 148,000 square feet, as well as an additional central utility plant that increased the campus total HVAC capacity for future needs.

These two buildings include several laboratory facilities, lecture halls and classrooms. The project incorporates complex plumbing and HVAC systems to fit the facility’s specific needs, such as clean rooms, chemical storage and mechanical engineering laboratories. The new buildings and central plant are linked with the existing campus HVAC system with huge underground piping distribution systems installed below the level of existing adjacent lakes, which made managing the groundwater levels during construction an exceptional challenge.

Location: Tyler, TX
General Contractor: Skanska Texas
Mechanical Contract Value: $8,916,836
Date Completed: 2006

Mccoy College Of Business At Texas State University

MCCOY COLLEGE OF BUSINESS AT TEXAS STATE UNIVERSITY
Located in San Marcos, just 30 miles southwest of Austin, work was completed on the business school at Texas State University in 2005.
The nearly 127,000 square-foot facility includes two theaters, technologically advanced classrooms, computer labs, conference rooms and faculty offices.

Location: San Marcos, TX
General Contractor: W.G. Yates Construction
Mechanical Contract Value: $1,664,923
Date Completed: 2005