• Commercial and
    Institutional Construction

    CONTACT US TODAY
  • Schedule Your New
    Project TODAY!

    CONTACT US TODAY
  • WHY CHOOSE A
    DESIGN-BUILD CONTRACTOR?

    • Cobb Mechanical’s qualified and experienced in-house engineers and support personnel can respond immediately to questions or problems.
    • Our trained technicians are on staff for initial balancing adjustment of systems to ensure customer satisfaction.
    • Our service and start-up professionals are involved throughout the project and remain at our clients’ disposal throughout the warranty period and beyond.
  • Utilizing BIM technologies to
    facilitate design, coordination,
    fabrication and installation.

  • Cobb Mechanical provides in-house
    quality control to ensure that our work
    meets the highest industry standards.

  • Commercial and
    Institutional Construction

    CONTACT US TODAY
  • Cobb Mechanical’s state-of-art
    fabrication shops are located
    in Colorado Springs.

Cypress Creek High School

Cypress Fairbanks ISD opened its seventh district high school, Cypress Creek High School, in northwest Houston in 2002.
The more than 460,000 square-foot facility includes a centralized administration suite, a library, a student commons, an 850-seat auditorium, music facilities and a daycare center. The HVAC system in this school makes use of a huge chilled water thermal storage system requiring a unique open-and-closed chilled water piping system approach. The use of the thermal storage tank allows the school system to operate the chillers at off-peak electrical power periods, which reduces the utility cost to the schools for the daytime cooling loads of the building.

Location: Houston, TX
General Contractor: SpawGlass
Mechanical Contract Value: $8,111,675
Date Completed: 2001